Rounding Round Rocks
We had a project at an adult care center going from the ground up. To get power to the site I had to get a 4" conduit across 250' of existing pavement.
We had a project at an adult care center going from the ground up. To get power to the site I had to get a 4" conduit across 250' of existing pavement.
I have been dealing with a lot of issues on my current project, one of which is the framers completely missing a lot of our openings where the duct work is to go through the walls.
Upon reviewing a sieve analysis test report submitted by our lab technician, Bill, I noticed that the reported mass of material retained on one of the screens was over the maximum allowable mass, as spelled out in the test procedure.
In week one of the Leadership Development Lab I was challenged to make a 90-day goal. My goal was to meet with each person in our company and get feedback on ways we could improve management. I asked each employee the same four questions:
Engage with acknowledgement
Louis, foreman for a fence and deck construction company in Vancouver, Washington, told session six of the Leadership Development Lab:
“When I chose my pearl*, I chose one of our […]